About the project

Kat Mekatronik Project was a factory project which continued for 2 years. Total electrical construction budget was over 3 Million USD.

The first concern about this factory’s design was master production improvements plan of our client, Kat Mekatronik. The second concern was fully automation system which was aiming to Light out Manufacturing type of Industrial 4.0 age.

Features of the Structure

• 25000 m2 factory producing electronic components for automotive industry.
• 2 Million different points are being monitored in the master automation system.
• Fully automated storage area had been constructed.
• LEED Gold certified.
• Have been selected as pilot factory by some of MENA and Asia countries.